Skip to main content
About Us
About Us

Company profile, service system, quality philosophy and technical capabilities.

View all
Global Certification
Global Certification

Market-access routes covering testing, certification, registration and technical documentation.

View all
News & Insights
News & Insights

Regulatory updates, standards interpretation and practical product-compliance guides.

View all
Contact Us
Contact Us

Tell us the product, destination market and planned project to begin a technical review.

View all
Architectural concept illustration of a modern testing institution

TESTING SERVICES

Professional Testing Services
Home > Testing Services > ETL Certification Project Support

ETL Certification Project Support

Standards review, electrical safety preparation, technical files and factory inspection support for North American ETL projects.

ETL projects connect the product design, critical components and manufacturing location. SCS helps organise existing safety evidence, model differences and technical documentation before the testing and application stages.

For a product family, provide a configuration table covering power ratings, supplies, enclosures and factories. Production inspection equipment and records should also be prepared so the intended mass production configuration corresponds to the approved models.

Architectural concept illustration of a modern testing institution

Service Details

Service typeTechnical Service

Delivery modeRegistration, submission and document support

Applicable productsAppliances, lighting, power supplies, audio/video and IT equipment, and other electrical products within the accepted project scope.

MarketsUnited States and Canada, according to the requested mark scope.

Regulations and standardsApplicable US and Canadian safety standards and the Intertek ETL programme requirements for evaluation, factory inspection and mark use.

Scope of serviceStandards and product grouping review; critical component evidence; construction and test preparation; model comparisons; factory documentation.

Required documentsApplicant and factory details, model list, schematics, BOM, critical component certificates, ratings, instructions and proposed labels.

Sample requirementsFinal construction samples and accessories. Identify voltage, power, enclosure, power supply and factory variations for representative model selection.

Lead timeThe schedule is confirmed after reviewing the requested work, sample readiness and any external review steps.

DeliverablesTest preparation files, issue records, application documentation and a factory readiness checklist. Intertek makes the certification and mark authorisation decisions.

Issuing partySubmissions and records follow the relevant regulator or scheme; SCS provides the agreed technical and application support.

FAQ · Can a report to a UL standard authorise the ETL mark?An existing report may support project review. The ETL programme and Intertek's mark authorisation must still be completed before the mark is used.

FAQ · Can one application include several brands or factories?List each brand, factory and model relationship for the certification programme to determine the listing and inspection arrangements.

Project Steps and Delivery

Project stepsRequirements review → document and sample assessment → project confirmation → testing or submission → technical review → delivery

Project confirmationConfirm product models, applicable standards, samples and deliverables.

DeliveryProvide the agreed reports or technical documents following technical review.

QUALIFICATION DOCUMENTSQualification and accreditation documents

Qualifications apply only within the scope and validity stated in the published documents. They do not imply that every project is covered by the same accreditation.

View qualification documents
Project consultation
Tell Us About Your Product and Project

Describe your product, destination market and intended project so the technical team can review the requirements and discuss the next steps with you.