Reliability and Ingress Protection Testing 

Service Details
Service typeTesting Service
Delivery modeProject review
Applicable productsElectronic equipment, components, enclosures and packaged products requiring environmental, mechanical or dust- and water-ingress verification.
MarketsDestination markets confirmed during technical review
Regulations and standardsEnvironmental conditioning, vibration, shock and ingress-protection methods selected from product standards or customer specifications. Test severity, sequence and acceptance criteria are agreed before testing.
Scope of serviceEnvironmental, mechanical and ingress-protection testing according to product use and declared protection level.
Required documentsIntended environment, target IP rating where relevant, mass and dimensions, mounting and closure details, operating states, functional checks and acceptance criteria.
Sample requirementsProvide the agreed installation hardware, fixtures, seals and connectors. Identify whether samples must operate during testing and whether one sample is to undergo a sequence of exposures.
Lead timeThe schedule is assessed according to product configuration, scope, document readiness and any external authority review.
DeliverablesTest report, result summary or technical findings as defined in the confirmed project scope.
Issuing partyIssued by the applicable group laboratory or a confirmed partner laboratory within the agreed project scope.
Project Steps and Delivery 
Project stepsRequirements review → product and document review → project planning → testing or application → technical review → delivery
Project confirmationConfirm product models, applicable standards, samples and deliverables.
DeliveryProvide the agreed reports or technical documents following technical review.
Qualifications apply only within the scope and validity stated in the published documents. They do not imply that every project is covered by the same accreditation.
View qualification documents
Describe your product, destination market and intended project so the technical team can review the requirements and discuss the next steps with you.








