Skip to main content
About Us
About Us

Company profile, service system, quality philosophy and technical capabilities.

View all
Global Certification
Global Certification

Market-access routes covering testing, certification, registration and technical documentation.

View all
News & Insights
News & Insights

Regulatory updates, standards interpretation and practical product-compliance guides.

View all
Contact Us
Contact Us

Tell us the product, destination market and planned project to begin a technical review.

View all
SCS Testing service page banner

SCS Testing

News & Insights
Home > News & Insights > Product Testing Guides

Before EMC Testing: Power Supplies, Cables and Operating Modes

2026-08-18 SCS Testing Source: SCS Testing Technical Notes

Before EMC Testing: Power Supplies, Cables and Operating Modes

A sample that powers up is not necessarily ready for EMC testing. Consider a controller with a display: a power-only setup may work perfectly, but the intended installation also includes Ethernet, sensors and an external load. If those accessories and the software needed to run the product stay at the factory, the test setup may be incomplete.

Start with a configuration sheet rather than a request that simply says “CE testing.” The following are practical preparation suggestions. The actual test scope depends on the product, destination market and applicable standards.

Send the configuration you intend to sell

ItemInformation to prepareDifferences to identify
Models and versionsSubmitted model, family models, PCB and software versionsChanges to power boards, ports, enclosures or radio modules
Power and accessoriesRated input, adapter models, power leads and optional batteriesAdapters supplied with the product and separately offered options
External connectionsPorts, cable lengths, shielding and supporting equipmentSimultaneous connections and cables selected by the user
Operation and monitoringStartup instructions, modes, loads and observable functionsHow a malfunction or recovery can be identified

A quiet standby mode may not represent normal use

Motor operation, data transfer and charging under load may produce a different electromagnetic profile from standby. List the modes the product can enter in normal use and explain how to reproduce them. Tell the project team early if a dedicated program, account or fixture is required. Agree applicable performance criteria against the relevant standard and product functions before immunity testing begins.

For apparatus covered by the EU EMC Directive, Annex II of Directive 2014/30/EU calls for assessment of normal intended operating conditions and configurations identified by the manufacturer as representative of intended use. Record why the chosen sample and configurations represent the range; a shared model prefix alone is not a useful engineering justification.

Make one final check against the physical sample

  • Compare model names and input ratings on the label, application and instructions. Record version differences.
  • Run the complete operating sequence and check that accessories, connections and status monitoring work.
  • Include earlier test findings, modifications and component changes. Flag differences that still need assessment.

Emissions and immunity address different concerns. Passing one test does not establish completion of the project. The European Commission’s EMC overview explains the two basic requirements.

When contacting SCS, send the intended use, destination markets and configuration sheet together. Start with EMC testing; for equipment with radio functions, also review the route through radio and RF exposure assessment. The project scope, samples and deliverables are confirmed during technical review.

Sources checked on 21 October 2026. This preparation guide does not replace a product-specific test plan.