Skip to main content
About Us
About Us

Company profile, service system, quality philosophy and technical capabilities.

View all
Global Certification
Global Certification

Market-access routes covering testing, certification, registration and technical documentation.

View all
News & Insights
News & Insights

Regulatory updates, standards interpretation and practical product-compliance guides.

View all
Contact Us
Contact Us

Tell us the product, destination market and planned project to begin a technical review.

View all
SCS Testing service page banner

SCS Testing

News & Insights
Home > News & Insights > Quality Management

Which Model Should You Send for Testing a Product Family?

2026-08-14 SCS Testing Source: SCS Testing Technical Notes

Which Model Should You Send for Testing a Product Family?

A product comes in a basic, higher-power and wireless version. Can one sample support all three models? Do not select the highest-power version on that basis alone. A sales family name does not explain the technical relationship among circuits, construction, power supplies and operating modes. A representative sample for one test may not represent the family for another.

Turn “nearly identical” into recorded differences

Before requesting a quotation, prepare a model matrix covering enclosure and materials, PCB, ratings, adapter, critical components, radio module and antenna, software version and operating modes. If an item is identical, say so. If it differs, identify the actual part or parameter rather than describing everything as “basically the same”.

The following is a hypothetical example of record keeping, not a sample-selection decision for a real product:

ModelDifference from the basic modelInformation to explain
A30 W, no radio functionBaseline PCB, enclosure, supply and software versions
B60 W, different supply and cooling partsSupply specification, cooling construction and material differences
C60 W, using B's power-supply and cooling configuration with an added radio moduleModule and antenna types, positions, operating modes and software controls

B's higher power deserves attention, but C's added radio function also needs assessment. The ratings alone do not establish that B represents A and C for every test.

Select the configuration for each assessment

Safety assessment may concern temperature, insulation, mechanical construction, critical materials and abnormal operation. For a product subject to the LVD, Annex III requires technical documentation to include risk analysis relevant to the applicable requirements. Sample selection needs to connect those risks with the differences among models.

An EMC project also considers ports, cables, supplies, loads and operating modes. Annex II of the EMC Directive calls for assessment of normal intended operating conditions and configurations identified by the manufacturer as representative of intended use. This does not mean an arbitrarily selected sample covers every model.

Differences in radio functions, antennas or transmitter settings require their own scope review. Some assessments may use different configurations of the same unit; others may need additional samples or tests. Agree quantities and combinations after review. Where a particular certification scheme defines family rules, those rules must also be followed.

Record the selection in the submission plan

  • The full model list and the meaning of each suffix.
  • The sample, accessories, software version and operating mode for each assessment.
  • The technical reason for selecting that configuration and its relationship to the other models.
  • Differences not yet covered, with the drawings, evidence or tests still required.

Tell the project contact if the supply, PCB, antenna or material changes during testing. Adding a model just before report issue leaves the underlying differences unresolved. Listing a model in a report does not replace the technical basis for its inclusion.

For a project enquiry, send SCS the model matrix, internal and external photographs, specifications, critical-component list and target-market requirements. Confirm the planned EMC, electrical-safety or radio scope before arranging samples. This gives the discussion a clear basis when additional models are proposed.

Public sources checked: 21 October 2026. The example and suggested workflow support preparation; the applicable standards, scheme rules and product assessment determine the actual approach.